Field Erected Tanks

SNC Lavalin

Completed November 2014

Monster Industries designed, planned and fabricated 2 large reactor tanks as well as supporting structure and sludge lime tank. The reactor tanks are 40ft tall and 30ft wide, each tank is capable of holding 790,000 liters. The bridge structure was completely supported by the 2 tanks as well as the sludge lime tank.

Scope of Work:

  • Engineered and designed project
  • Supplied all Material and fabrication for project
  • Supplied all Project management for entire scope of work
  • All rigging and Crane services needed to install all structural components as well as Mechanical
  • All safety Practices, QA/QC and implementation
  • All NDT requirements as per API 650 specifications
  • Commission and assist with startup

SNC Lavalin/Glencore - Field Erected Tanks